Thursday, October 31, 2019

Status of Project - Mid-Day - October 31, 2019

Master bath - much larger with moving shower

Master shower

Rough-in plumbing - drain was able to be centered

Rough-in plumbing - shower head and lever

Rough-in plumbing - shower head

Rough-in plumbing - shower lever

Rough-in plumbing - shower drain

Hall bath - tile being set

Upstairs bath - tile set - awaiting grout

Upstairs bath - tile set - awaiting grout
Drywall repair needed from removing backsplash - Upstairs Bath


Drywall repair needed from removing backsplash - kitchen




Tile saw tenting to keep from freezing

Yes - Larry is in there cutting tile

Wednesday, October 30, 2019

Status of Project - End of Day - October 30, 2019

BACKER BOARD INSTALLED IN ALL TILE AREAS - TILE INSTALL BEGAN AT NOON ON 10/30.  BEGAN WITH UPSTAIRS BATHROOM.


















Friday, October 25, 2019

Status of Project - October 25, 2019

New Subfloor in area where bamboo flooring was



Look how open it is now!!!!!

Shower before niche framed in


Wall that needs to be moved to allow for shelving.

Cleaned up area where ping pong table was.  It is cleaned, folded and set aside now.

Shelving area next to shower framed in.  View from closet

Shelving area framed in - view from bathroom.

Shelving area framed - bathroom side view

Niche

Backing for towel hooks