Thursday, October 31, 2019

Status of Project - Mid-Day - October 31, 2019

Master bath - much larger with moving shower

Master shower

Rough-in plumbing - drain was able to be centered

Rough-in plumbing - shower head and lever

Rough-in plumbing - shower head

Rough-in plumbing - shower lever

Rough-in plumbing - shower drain

Hall bath - tile being set

Upstairs bath - tile set - awaiting grout

Upstairs bath - tile set - awaiting grout
Drywall repair needed from removing backsplash - Upstairs Bath


Drywall repair needed from removing backsplash - kitchen




Tile saw tenting to keep from freezing

Yes - Larry is in there cutting tile

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.